alogue of Encouraged Hi-tech Products for Foreign

2003-6-2 · Promulgation Date:2003-06-02 Promulgation Nuer:2003060220030602The Ministry of Science and Technology, the Ministry of CommerceDocument of the

alogue of Industries for Guiding Foreign Investment

2017-6-28 · Manufacturing of gear transmission used for wind power or high speed rail, gear transmission agent with adjustable blades used for vessels, and large-sized and heavy-load

images.mofcom.gov.cn

2007-4-19 · It plans to construct information exchange center, distribution center, bonded area, warehouse area, pang ground, fireproof equipment, maintainence field, power distribution house, toilet, and garbage house etc. Toward 2010, it will have 40 milion tons cargo throughput and will realize a macro logistics output value of 2.5 billion Yuan.

Ministry of Commerce of the P.R.China - China …

I. Introduction: KYN28-12 (GZS1)-type armored remove AC metal-enclosed switchgear rated voltage of 3.6 ~ 12kV line three-phase AC 50Hz indoor power distribution equipment. Power transmission for power plants, electrical power systems and industrial and mining enterprises by the substation, distribution, high pressure can also be used to

Ministry of Commerce of the P.R.China - China …

LW8-40.5 SF6 circuit breaker is three-phase AC 50Hz outdoor high-voltage electrical equipment, transmission and distribution system for 40.5KV control and protection, can also be used to open and close contact breaker and capacitor appliions. according to the use of premises are divided into distribution-based, plant-based, capacitor

WT/ACC/SPEC/CHN/1/Rev.8 -

2002-7-16 · They had the power to formulate the Constitution and laws. The State Council, i.e., the Central People''s Government of China, was the executive body of the highest organ of state power. The State Council, in accordance with the Constitution and relevant laws, was entrusted with the power to formulate administrative regulations.

images.mofcom.gov.cn

2005-8-7 · AND TRANSFER OF A 2X10 MW DIESEL POWER GENERATION PLANT ALONG WITH THE ASSOCIATED TRANSMISSION AND DISTRIBUTION NETWORK IN 1.0 1.1

images.mofcom.gov.cn

2007-4-19 · It plans to construct information exchange center, distribution center, bonded area, warehouse area, pang ground, fireproof equipment, maintainence field, power distribution house, toilet, and garbage house etc. Toward 2010, it will have 40 milion tons cargo throughput and will realize a macro logistics output value of 2.5 billion Yuan.

images.mofcom.gov.cn

2007-4-19 · It plans to construct information exchange center, distribution center, bonded area, warehouse area, pang ground, fireproof equipment, maintainence field, power distribution house, toilet, and garbage house etc. Toward 2010, it will have 40 milion tons cargo throughput and will realize a macro logistics output value of 2.5 billion Yuan.

AUDIT

2019-4-1 · 2. From 2007 to 2009, the College failed to include in its books for consolidated accounting distribution revenues of 11.2839 million yuan and 6.4448 million yuan received by its affiliated non-independent accounting units: the Editorial and Distribution Department and the "Journal of Law Appliion" Editorial Department respectively. 3.

GROUP A BASIC RAW MATERIAL CONSUMABLE NUER …

2010-5-5 · power plants h.28.1.1 contractors for mechanical high pressure and temperature h.28.1.2 contractors for electrical high voltage amd protection h.28.2.1 contractors electromechanical – mechanical works in the power plant h29 repairing works for lv and mv transformers till the max power of 1000 kva h30 metallic tanks constructions

fta.mofcom.gov.cn

2018-1-26 · Puttalam Coal Power Plant. The 900 MW Coal Power Plant was initiated with long term financial assistance from China, to reduce dependency on oil for power generation. The investment in this project includes the construction of a jetty, transmission lines, power stations and an ancillary administration facility in Puttalam.

AUDIT

2019-4-1 · The audit showed that the Three Gorges Project completion draft financial final accounts overstated investments totaling 755 million yuan (accounting for 0.36% of the total final account), in which over-settled 357 million yuan in project costs (dam project -- 191 million yuan, power transmission and transformation project -- 166 million yuan

images.mofcom.gov.cn

2007-4-19 · It plans to construct information exchange center, distribution center, bonded area, warehouse area, pang ground, fireproof equipment, maintainence field, power distribution house, toilet, and garbage house etc. Toward 2010, it will have 40 milion tons cargo throughput and will realize a macro logistics output value of 2.5 billion Yuan.